Raiganj Dalkhola Highways Ltd
Sector: Automotive • Location: India
Source: World Bank Group
Raiganj Dalkhola Highways Ltd was created to expand from 2 to 4 lanes Raiganj and Dalkhola section of NH-34 (49.53 km) in the state of West Bengal and operate it under a Design, Build, Finance, Operate, and Transfer (DBFOT) Toll basis. Farakka Raiganj Highways Ltd was a wholly owned subsidiary of Hindustan Construction Company Limited and covered in Murshidabad district of West Bengal. The conce
- Status
- Prospective
- Sector
- Automotive, Commercial, Road, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Raiganj Dalkhola Highways Ltd
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Raiganj Dalkhola Highways Ltd was created to expand from 2 to 4 lanes Raiganj and Dalkhola section of NH-34 (49.53 km) in the state of West Bengal and operate it under a Design, Build, Finance, Operate, and Transfer (DBFOT) Toll basis. Farakka Raiganj Highways Ltd was a wholly owned subsidiary of Hindustan Construction Company Limited and covered in Murshidabad district of West Bengal. The concessionaire agreed to undertake all expenditure to complete the project and recover the same by toll fees fee for 30 years including a construction period of 30 months. The project was one of the three projects awarded to Hindustan Construction Co Ltd for three contiguous sections of approximately in NH34 for a total of 256 kms at a total cost of 3,231 crores in February 2010. The other two are Baharampore Farakka Highways Ltd and Farakka Raiganj Highways Ltd. The three concessions were awarded by National Highway Authority of India on a Design, Build, Finance, Operate, and Transfer (DBFOT) Toll basis with a cumulative grant of Rs. 10,330 million (US$ 225.9 million). The bid criteria was the minimum subsidy. The first section was from Baharampore to Farakka (103 km), the second from Farakka to Raiganj (103 km) and the third between Raiganj and Dalkhola (50 km). These projects were to be implemented by three separate special purpose vehicles (SPVs) viz. Baharampore- Farakka Highways Ltd. (BFHL), Farakka-Raiganj Highways Ltd. (FRHL) and Raiganj-Dalkhola Highways Limited (RDHL) respectively. The total project cost initial cost was estimated to Rs6,843 million (US$ 149.6 million). Financing was signed in July 2010. Financing was signed in July 2010.Financing comprises Rs3.216bn term loan facility, a government grant estimated to be US$75.3 million (one third of the grant for the three projects US$225.9 million), and the rest in equity. The debt was arranged by YES Bank. Construction began at the end of October 2010. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Road, Government |
Article published date | 2024-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage