Raigarh Ultra Supercritical Thermal Power Plant Coal Handling System
One of 1,710 projects Taiyo tracks in Chhattisgarh.
Source: The Tribune
BTL EPC Ltd has been awarded a Rs475 crore contract for the Complete Coal Handling and Ash Handling System at the 2x800 MW (Phase II) Raigarh Ultra Supercritical Thermal Power Plant in Chhote Bhandar, Chhattisgarh. The project involves the design, engineering, procurement, and installation of advanced systems for efficient material transportation and ash handling.
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT)
- Location
- Chhattisgarh, India
- Updated
- 22 Jul 2026
- Source
- The Tribune
ConstructChat
Ask ConstructChat about Raigarh Ultra Supercritical Thermal Power Plant Coal Handling System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BTL EPC Ltd has been awarded a Rs475 crore contract for the Complete Coal Handling and Ash Handling System at the 2x800 MW (Phase II) Raigarh Ultra Supercritical Thermal Power Plant in Chhote Bhandar, Chhattisgarh. The project involves the design, engineering, procurement, and installation of advanced systems for efficient material transportation and ash handling. |
Original sector | Power |
Budget |
Location
Country | India |
State | Chhattisgarh |
Source
Source | The Tribune |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
