logo

Rail Expansion Downtown Line 3 Extension

Sector: Car parking • Location: Singapore

Source: Land Transport Authority, Singapore

Project

Look forward to as much as 15 minutes reduction in traveling time from east to west with the Downtown Line 3 extension (DTLe). With the addition of two stations – Xilin and Sungei Bedok – residents in the Marine Parade area can look forward to more travel options and easier transfers to the East-West Line (EWL) and the future Thomson-East Coast Line (TEL). Travel time from Marine Parade to Tam

Project Information FAQ

Project Information

3 Q
The project “Rail Expansion Downtown Line 3 Extension” is an infrastructure initiative in the Car parking sector, located in Singapore. Taiyo aggregates data on it from Land Transport Authority, Singapore.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Look forward to as much as 15 minutes reduction in traveling time from east to west with the Downtown Line 3 extension (DTLe). With the addition of two stations – Xilin and Sungei Bedok – residents in the Marine Parade area can look forward to more travel options and easier transfers to the East-West Line (EWL) and the future Thomson-East Coast Line (TEL). Travel time from Marine Parade to Tampines is reduced to about 25 minutes by rail, compared to over 40 minutes by bus currently. Greater public transport accessibility to the Changi Business Park and Expo areas. Commuters will also enjoy more direct access to the Central Business District. Commuters in the regions can look forward to more space on the train as DTLe together with TEL and EWL will offer alternative routes for commuter in the region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data