Rail Tie Wind Project
Sector: Wind • Location: Tie Siding, Wyoming, United States of America
Source: Dodge USA
ConnectGen is developing a 504 megawatt wind power project in southeastern Albany County. The project will be located on private and state lands near Highway 287 outside of Tie Siding and is anticipated to begin operations by the end of 2026.
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Rail, Road, Commercial
- Location
- Tie Siding, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rail Tie Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ConnectGen is developing a 504 megawatt wind power project in southeastern Albany County. The project will be located on private and state lands near Highway 287 outside of Tie Siding and is anticipated to begin operations by the end of 2026. |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Tie Siding |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Rail, Road, Commercial |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
