Rail Trail Structure Replacement
Sector: Mass Transit • Location: Perth East, Ontario, Canada
Source: Dodge
The work to be done under this contract consists of supplying all labour, equipment and materials to construct the drainage work as outlined in the Scope of Work, Drawings, General Conditions and other Specifications
- Status
- Closed
- Sector
- Mass Transit, Rail, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive
- Location
- Perth East, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rail Trail Structure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done under this contract consists of supplying all labour, equipment and materials to construct the drainage work as outlined in the Scope of Work, Drawings, General Conditions and other Specifications |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Perth East |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
