logo

RAIL&RIVER II

Sector: Mass Transit • Location: Congo, Democratic Republic of

Source: World Bank Group

Project
Closed

The objective of the Railway and River Transport Project for Zaire is to provide means for continued improvement in operational efficiency and thus to expand the effective transport capacity of the Office National des Transports (ONATRA, the Government agency responsible for inland water services, the railway between the ports of Matadi and Kinshasa, and their operation). For the Matadi-Kinshasa r

Project Information FAQ

Project Information

5 Q
The project “RAIL&RIVER II” is an infrastructure initiative in the Mass Transit sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Railway and River Transport Project for Zaire is to provide means for continued improvement in operational efficiency and thus to expand the effective transport capacity of the Office National des Transports (ONATRA, the Government agency responsible for inland water services, the railway between the ports of Matadi and Kinshasa, and their operation). For the Matadi-Kinshasa railway the principal item comprises track renewal and improvements, which will reduce delays to trains and improve the utilization of rolling stock; for the connecting Kinshasa-Ilebo river service the project will provide additional barges; and for the ports there is a feasibility study to extend their capacity as part of the general expansion of the Voie Nationale. These port extensions may be financed as a subsequent Bank Group project. The economic return on the project is estimated at 28 percent on the basis of shadow pricing of foreign exchange and local unskilled labor. This return takes account of the benefits (to Zaire) of increased capacity on the all-Zaire route to the sea, and of reduced operation costs on this route as a result of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data