logo
ProjectClosed

RAIL&RIVER II

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The objective of the Railway and River Transport Project for Zaire is to provide means for continued improvement in operational efficiency and thus to expand the effective transport capacity of the Office National des Transports (ONATRA, the Government agency responsible for inland water services, the railway between the ports of Matadi and Kinshasa, and their operation). For the Matadi-Kinshasa r

Status
Closed
Sector
Mass Transit, Road, Water Supply and Storage, Rail, Seaport, Commercial, Government, Residential
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about RAIL&RIVER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RAIL&RIVER II” is an infrastructure initiative in the Mass Transit sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Railway and River Transport Project for Zaire is to provide means for continued improvement in operational efficiency and thus to expand the effective transport capacity of the Office National des Transports (ONATRA, the Government agency responsible for inland water services, the railway between the ports of Matadi and Kinshasa, and their operation). For the Matadi-Kinshasa railway the principal item comprises track renewal and improvements, which will reduce delays to trains and improve the utilization of rolling stock; for the connecting Kinshasa-Ilebo river service the project will provide additional barges; and for the ports there is a feasibility study to extend their capacity as part of the general expansion of the Voie Nationale. These port extensions may be financed as a subsequent Bank Group project. The economic return on the project is estimated at 28 percent on the basis of shadow pricing of foreign exchange and local unskilled labor. This return takes account of the benefits (to Zaire) of increased capacity on the all-Zaire route to the sea, and of reduced operation costs on this route as a result of the project.

Original sector

Transportation

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Water Supply and Storage, Rail, Seaport, Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project