Railroad Greenway Multi-Use Paving Improvements Phase II
Sector: Cement • Location: New Market, Alabama, United States of America
Source: Dodge
The project generally consists of constructing a new 10-foot-wide paved multi-use trail along an abandoned railroad corridor between Smokey Hills Court and County Lake Road. The scope of work includes clearing and grubbing, unclassified and borrow excavation, paving, concrete sidewalk installation, erosion and sediment control measures, signage, striping, and bollard installation. Two bid alternat
- Status
- Closed
- Sector
- Cement, Mass Transit, Government, Road, Bridge, Commercial, Car parking, Automotive, Rail, Manufacturing (Industrial)
- Location
- New Market, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Railroad Greenway Multi-Use Paving Improvements Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of constructing a new 10-foot-wide paved multi-use trail along an abandoned railroad corridor between Smokey Hills Court and County Lake Road. The scope of work includes clearing and grubbing, unclassified and borrow excavation, paving, concrete sidewalk installation, erosion and sediment control measures, signage, striping, and bollard installation. Two bid alternates are included: one for the design, fabrication, and installation of a glue-laminated wood bridg... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | New Market |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Mass Transit, Government, Road, Bridge, Commercial, Car parking, Automotive, Rail, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
