RAILROAD
Closed · Cameroon
Source: World Bank Group
The main items included in the program are track renewal and rehabilitation, and purchase of locomotives and rolling stock. The rehabilitation of the Douala-Yaounde line is urgent if this vital section of the line is to cope with the substantial additional traffic that will be generated by the new extension. The proposed loan will finance the foreign exchange component of urgently needed track ren
- Status
- Closed
- Sector
- Rail, Bridge, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RAILROAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main items included in the program are track renewal and rehabilitation, and purchase of locomotives and rolling stock. The rehabilitation of the Douala-Yaounde line is urgent if this vital section of the line is to cope with the substantial additional traffic that will be generated by the new extension. The proposed loan will finance the foreign exchange component of urgently needed track renewal on existing lines, reconstruction of a bridge on the main line, rolling stock for passenger and freight traffic, as well as interest on the Bank loan during the construction period. The loan will also finance an economic study of the realignment of the Douala-Yaounde central line. Technical studies are being carried out by government which has requested the Bank and other agencies to consider participating in financing the project. |
Original sector | Transportation |
Location
Country | Cameroon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in Cameroon
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Cameroon - Agricultural Value Chain Development Project
- Equatorial Guinea LNG Project, Bioko Island, Punta Europa
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
- ENEO Cameroon
- RAILWAYS CONCESSION
- Cassava Transformation project for producing value added products
- Création d'un restaurant
