Rails-with-Trails Multiuse Path Study
The owner, status and timeline of this project. A free account opens every field.
Source: Norwalk Hour
A study for a potential multiuse path along a 9-mile portion of the 20.24-mile Armory Branch rail line, which is actively operated by the Connecticut Southern Railroad. The trail would be buffered from the rail line by a fence and a minimum 10-foot setback, potentially connecting East Windsor and Enfield to the East Coast Greenway and other trails.
- Status
- Prospective
- Sector
- Rail
- Location
- Enfield, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Norwalk Hour
ConstructChat
Ask ConstructChat about Rails-with-Trails Multiuse Path Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A study for a potential multiuse path along a 9-mile portion of the 20.24-mile Armory Branch rail line, which is actively operated by the Connecticut Southern Railroad. The trail would be buffered from the rail line by a fence and a minimum 10-foot setback, potentially connecting East Windsor and Enfield to the East Coast Greenway and other trails. |
Original sector | Planning |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Enfield |
Source
Source | Norwalk Hour |
URL |
More Details
Record type | Project |
Sector | Rail |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
