Railway City Development PPP Project
Closed · Nairobi Area
Source: InfraPPPWorld
The Railway City Development Project in Nairobi envisages the redevelopement of the Nairobi Central Railway Station and its surrounding areas into a multi-modal, transit-oriented, urban development dubbed “The Nairobi Railway City”.The project site is located at the centre of Nairobi city and is surrounded by the industrial area to the south, the CBD area to the north and dilapidated and ready for
- Status
- Closed
- Sector
- Government, Mass Transit, Hotel, Manufacturing (Industrial), Residential, Commercial, Rail
- Location
- Nairobi Area, Kenya
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Railway City Development PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Railway City Development Project in Nairobi envisages the redevelopement of the Nairobi Central Railway Station and its surrounding areas into a multi-modal, transit-oriented, urban development dubbed “The Nairobi Railway City”.The project site is located at the centre of Nairobi city and is surrounded by the industrial area to the south, the CBD area to the north and dilapidated and ready for redevelopment residential houses on the eastern side. The total area is 172ha (425 acre).The project includes the precincts/developments highlighted below:Central StationFAR 400, 15 floors, multimodal transit centre and hub incorporating mixed-use commercial.International tourist destination with aMeetings Incentives Conferences and Exhibitions (MICE) Core44ha, FAR 600, 45 floors, hotels, convention, casino, theme park, and high-end commercial.Railway City Housing, 51 ha, FAR 250, 5 to 12 floors, 3,522 units.Government Office precinct, 6.3 ha, FAR 400%, with Government as an anchor tenant.R&D Zone, 4ha, FAR 400, 15 floors, knowledge industry and synergy with TUK thereby tapping the entrepreneurial and youthful as a destination.Street Commercial62ha, FAR 300, 10 floors Mix use commercial, housing, Office, 2.4km shopping promenade (the longest in Eastern Africa).International office precinct36ha, FAR 600, 25 floors, top tier office, and working zoneEAST Core (New Wakulima)12ha, FAR 250, 8 floors, new commercial, community center.High tech industry with SME cluster with grand park, 20 ha, FAR 400, 10 floors.Mixed-use center core offering commercial offices, high-end housing and grand park and station. |
Original sector | Transport, Social & Health |
Procurement method | |
Budget |
Location
Country | Kenya |
State | Nairobi Area |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Government, Mass Transit, Hotel, Manufacturing (Industrial), Residential, Commercial, Rail |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Kenya
- Acquisition of equipment and Facilities for expansion of hospitality project
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- Expansion plan for introducing ready to drink fortified porridge
- Development and Capacity Building of Sargasso Industries
- Manufacture of Rapid Diagnostic Test Kits
- SOLAR POWER GENERATION PROJECT
- M-SAFI WASTE EXPERTS
