logo
ProjectClosed

RAILWAY REHABILITATI

Sector: Mass Transit • Location: Brazil

Source: World Bank Group

The Technical Report on a Priority Rehabilitation Project of the Central do Brazil Railway will provide financing for the rehabilitation project as recommended by the Joint Commission. This program consist of five projects designed to improve the traffic capacity and the operating efficiency of the railway. These five projects are as follows: Lengthening of passing sidings between Belo Horizonte a

Status
Closed
Sector
Mass Transit, Rail, Automotive, Steel, Metal, Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about RAILWAY REHABILITATI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RAILWAY REHABILITATI” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Technical Report on a Priority Rehabilitation Project of the Central do Brazil Railway will provide financing for the rehabilitation project as recommended by the Joint Commission. This program consist of five projects designed to improve the traffic capacity and the operating efficiency of the railway. These five projects are as follows: Lengthening of passing sidings between Belo Horizonte and Lafayette, expansion of yards at Lafayette, with a total track increase of 23,200 meters and installation of 50 turnout apparatuses. Rehabilitation of main tracks between Rio de Janeiro, Sao Paulo and Belo Horizonte. Construction at Barra do Pirai of a diesel maintenance and repair shop for the servicing of all diesel-electric locomotives operating on the broad gauge lines of the system. Construction of the Arara marshalling yard at Rio de Janeiro with a capacity of 700 freight cars for the handling of freight to and from the port of Rio de Janeiro, The acquisition of 2,265 new all steel or steel under frame freight cars. The above mentioned projects are considered as urgent ones requiring prompt implementation.

Original sector

Transportation

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Automotive, Steel, Metal, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project