RAILWAYS II
Sector: Mass Transit • Location: Mali
Source: World Bank Group
The Second Railway Project will consist essentially of: (a) track and buildings: (i) equipment for and renewal of 21.5 km of track; (ii) ballasting of 210 km of line; (iii) joint welding of 380 km of rails; and (iv) minor repairs to bridges; (b) motive power and rolling stock: 4 main line locomotives; 5 shunting locomotives; 2 railcars; 8 trailers; 4 passenger coaches; 125 freight cars and spare p
- Status
- Closed
- Sector
- Mass Transit, Rail, Power Generation (CCGT), Automotive, Government
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RAILWAYS II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Railway Project will consist essentially of: (a) track and buildings: (i) equipment for and renewal of 21.5 km of track; (ii) ballasting of 210 km of line; (iii) joint welding of 380 km of rails; and (iv) minor repairs to bridges; (b) motive power and rolling stock: 4 main line locomotives; 5 shunting locomotives; 2 railcars; 8 trailers; 4 passenger coaches; 125 freight cars and spare parts for rolling stock; and (c) management: equipment for accounts/statistics, consulting services and training. |
Original sector | Transportation |
Location
Country | Mali |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Power Generation (CCGT), Automotive, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
