Rajasthan Sun Technique Energy Private Limited

Sector: Solar • Location: India

Source: World Bank Group

Project
Active

In November 2010, Rajasthan Sun Technique Energy Private Limited (Sun Technique), a subsidiary of Reliance Power Limited (RPL),was awarded the license for setting up a 100MW concentrated solar thermal power project at Dhursar in Jaisalmer District of Rajasthan under the Jawaharlal Nehru Solar Mission (JNNSM) Phase-I (Batch-I) of the scheme. Under the JNNSM the total aggregated capacity of grid con

Project Information FAQ

Project Information

5 Q
The project “Rajasthan Sun Technique Energy Private Limited” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2010, Rajasthan Sun Technique Energy Private Limited (Sun Technique), a subsidiary of Reliance Power Limited (RPL),was awarded the license for setting up a 100MW concentrated solar thermal power project at Dhursar in Jaisalmer District of Rajasthan under the Jawaharlal Nehru Solar Mission (JNNSM) Phase-I (Batch-I) of the scheme. Under the JNNSM the total aggregated capacity of grid connected Solar Projects in Phase-I was expected to be 1000 MW. The deployment of Solar PV and Solar Thermal projects would be in the ratio of 50:50. Sun Technique had acquired the 340 hectares of land required for the project. Electricity generated from the project would be evacuated for consumption in the Combined Regional grid (comprising the electrical system of Northern,Eastern, Western, and North-Eastern grids) of India. The 100 MW Concentrated Solar Thermal Power Plant(CSP) would use Areva's Compact Linear Fresnel Reactor technology. Sun Technique had contracted Reliance Infrastructure (RInfra) for the project EPC, and Areva Solar Inc. would provide Solar Field technology supply. Sun Technique had taken the approval from Powergrid for interconnection with the nearest 132kV generation/pooling substation. The JNNSM mission had designated NTPC’s Vidyut Vyapar Nigam Limited (NVVN) as the nodal agency for procurement of solar power. On 18th August 2010, NVVN invited RFQs from interested developers to develop 150 MW solar PV projects with a capacity of 5 MW each, and 500 MW solar thermal projects with a minimum capacity of 5 MW and maximum of 100 MW each. NVVN received 418 RFQ responses on September 24, 2010 from both PV and solar thermal project developers (343 applications for solar PV,55 for solar thermal projects, and 5 for combined thermal and PV projects). As the total capacity of the shortlisted projects were in excess of the approved capacity of 150 MW Solar PV Projects and 500 MW Solar Thermal Projects, bidders were required to submit proposals offering maximum discount on the CERC (Central Regulator) approved applicable tariff for grid connected solar power projects for FY 2010-11 - a reverse bidding auction process. The last date for the submission of proposal was November 16, 2010. For Solar Thermal projects, NVVN received 66 bids from project developers indicating discounts offered by each over CERC determined tariff of INR 15.31/kWh. Majority of the bids were below 300 paise. There were 17 bids which offered zero discount. Since, the target allocation for solar thermal projects was 500 MW, only the top 8 discounts were finally selected to set up solar power projects. The cutoff discount was 297paise. MEIL Green Power Limited (MGPL) won the project quoting a tariff of US$ 0.262/kWh (INR 11.97/kWh @ 45.73 INR/USD) - a discount of 334 paise. In January 2011, Rajasthan Sun Technique Energy Private Limited had entered into a 25-year Power Purchase Agreement with NTPC Vidyut Vyapar Nigam (NVVN), which was the the nodal agency to purchase solar power generated by independent solar power producers, under JNNSM. JNNSM provided for a scheme of "bundling" relatively expensive solar power with cheaper power from the unallocated quota of the Government of India out of the capacity of the NTPC based coal stations.This cheaper bundled power would then be sold to state power distribution companies at the CERC regulated price. This would bring down the gap between the average cost of power and sales price of power of the state Discom. The total capacity of 50MW was also eligible for carbon credits. Sun Technique would pass on the gross benefits of CDM to the distribution licensee (NVVN) in the following manner - (a) 100% of the gross proceeds to be retained by Sun Technique in the 1st year after the date of COD, (b) in the 2nd year, the share of NVVN would be 10% which would be progressively increased by 10% every year till it reaches 50%, where after the proceeds would be shared equally by Sun Technique and NVVN. Transmission and/or w ECB loan of US$ 228.32mn, was contributed by ADB (US$ 103mn), US Exim Bank (US$ 80.32mn), and FMO of Netherlands (US$ 45mn).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data