Rajasthan Wind-Solar Energy Curtailment
Sector: Solar • Location: Rajasthan, India
Source: Mercomindia.com
Nearly 4 GW of wind-solar energy projects in Rajasthan have been curtailed since March 2025 due to delays in transmission projects and lower power demand caused by above-normal rainfall. Curtailment increased from 8.5% in March to 51.5% by August 2025. Solar and wind projects have 'must-run' status since 2021, and curtailments are only allowed for grid safety reasons with written communication to
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT), Wind
- Location
- Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Rajasthan Wind-Solar Energy Curtailment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing curtailment |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nearly 4 GW of wind-solar energy projects in Rajasthan have been curtailed since March 2025 due to delays in transmission projects and lower power demand caused by above-normal rainfall. Curtailment increased from 8.5% in March to 51.5% by August 2025. Solar and wind projects have 'must-run' status since 2021, and curtailments are only allowed for grid safety reasons with written communication to generators. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
