logo

Rakushechnoye (Shelly) Oil and Gas Field

Sector: Mass Transit • Location: Thailand

Source: Hydrocarbon Technology

Project
Closed

Rakushechnoye oil and gas field, also known as Shelly field, is located on the Mangyshlak Peninsula in the south-western Manghystau province, around 15km from the Caspian Sea. The onshore field covers an area of 354.45km² and has been appraised for 10% of the area so far. The field lies within close range of major export facilities, approximately 110km south from Aktau city and port, 60km from Er

Project Information FAQ

Project Information

4 Q
The project “Rakushechnoye (Shelly) Oil and Gas Field” is an infrastructure initiative in the Mass Transit sector, located in Thailand. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Rakushechnoye oil and gas field, also known as Shelly field, is located on the Mangyshlak Peninsula in the south-western Manghystau province, around 15km from the Caspian Sea. The onshore field covers an area of 354.45km² and has been appraised for 10% of the area so far. The field lies within close range of major export facilities, approximately 110km south from Aktau city and port, 60km from Eraliyevo railway station, and 25km from Kuryk, a sea port situated along a major oil transport route. Work-over activities on the field’s existing wells is being carried out by Sumatec Resources Berhad (Sumatec), through its wholly-owned subsidiary Sumatec Corporation. Initial production for the first work-over well commenced in January 2014, and the production capacity of the well is estimated to be 150 barrels of oil per day. The Bolashak oil and gas processing plant, located 40km north-west of Atyrau in Kazakhstan, was launched in June 2013. The Rakushechnoye field was discovered in 1973, initial production started in 1978, and seismic survey of the field and the drilling of 47 exploration and production wells were completed by 1987. Production from the field was however halted in 1998. A 25-year oil and gas concession was awarded to CaspiOilGas (COG) by the Ministry of Energy and Mineral Resources (now known as Ministry of Oil and Gas Kazakhstan) in August 2000, following which further well re-entry and research works, including the construction of field facilities, personnel camp and service facilities were carried out starting from 2004 and the field was recommissioned in 2007. Under a framework agreement, an investment production sharing contract was awarded to Sumatec to develop and extract hydrocarbons from the field by CaspiOilGas (COG), and Markmore Energy (Labuan) (MELL), the owner of COG, in November 2011. Sumatec further signed a joint investment agreement (JIA) with MELL and COG in March 2012 and formally took over the field operations in November 2013, by meeting the requirements set under the JIA. The field is estimated to hold proven and probable recoverable reserve of 331.67 million barrels of oil equivalent (74.7mmbbl of oil and 257mmboe of natural gas). The reserves are expected to further increase when the southern part of the concession area, covering about 90% of the acreage, is appraised and tested. The reservoirs are located within the Jurassic and Triassic formations at depths of 2,000m and 3,000m respectively. The work-over approach has been chosen for the development of the oil and gas field, with the aim of cutting down the development cost. Initial works such as improvements to the road access, pad locations around each wellhead, well clean up works, and formation evaluation (wireline logging) activities started in February 2014. Rig operations at the field started in April 2014. Up to 12 wells are expected to be ready for production by August 2014 and three sidetrack wells will also be drilled by end of the year. A target production capacity of 2,000 barrels per day (bbls/d) is expected by 2014 and peak production of 9,000bbls/d is expected within four years. Around 17 billion cubic feet per year of gas production is expected within three years. Sumatec will supply around 120 million standard cubic feet per day (mmscfd) of gas to a potential gas buyer by 2017, whereas the excess gas produced from the field will be re-injected into the reservoir for pressure maintenance and reservoir drive. The work-over Cardwell rig for the field was constructed in Croatia. SRK Consulting assessed the field’s reserves.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data