Ramona Expressway Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: Rider Street to 600 feet east of 5th Street Length: Approximately 5 miles District: 5 Communities: Nuevo and Lakeview
The County of Riverside Transportation Department is proposing to resurface approximately 5 miles of Ramona Expressway from Rider Street to 600 feet east of 5th Street. Ramona Expressway is classified as an Expressway in the County of Riverside General Plan. Ramona Expres
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: Rider Street to 600 feet east of 5th Street Length: Approximately 5 miles District: 5 Communities: Nuevo and Lakeview The County of Riverside Transportation Department is proposing to resurface approximately 5 miles of Ramona Expressway from Rider Street to 600 feet east of 5th Street. Ramona Expressway is classified as an Expressway in the County of Riverside General Plan. Ramona Expressway currently ranges from 40-126 feet wide with dike at various segments of the roadway. The proposed project includes either grinding, pulverizing, or removing the roadway width, followed by overlaying Hot Mix Asphalt (HMA) and/or Rubberized Hot Mix Asphalt (RHMA). Additional improvements include: · Construction and/or reconstruction of asphalt concrete overside drain, dike, driveway, and down drain pipe · Placement of safety edge, shoulder backing, centerline rumble strip, and shoulder rumble strip · Guardrail · Detector loops · Utility adjustments · Striping of roadway, including pavement markers and reflectors · Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will raise the existing roadway profile by 0.17-0.57 feet. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
