Rampur - Kathgodam Package II
Sector: Road • Location: India
Source: World Bank Group
Rampur - Kathgodam Package II envisages the widening, strengthening & rehabilitation of Rampur- Kathgodam section of NH-87 from km 42.791 to km 88.000, with a length of 49.8 km.
Rampur - Kathgodam highway is developed in two phases with separate financial packages. For both projects Sadbhav was chosen as preferred bidder.
The SPV created for the implementation of the project is Sadbhav Nainita
- Status
- Prospective
- Sector
- Road, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Rampur - Kathgodam Package II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rampur - Kathgodam Package II envisages the widening, strengthening & rehabilitation of Rampur- Kathgodam section of NH-87 from km 42.791 to km 88.000, with a length of 49.8 km. Rampur - Kathgodam highway is developed in two phases with separate financial packages. For both projects Sadbhav was chosen as preferred bidder. The SPV created for the implementation of the project is Sadbhav Nainital Highway Private Limited, in which Sadbhav is a sole sponsor. Project is initiated under the Hybrid Annuity model, according to which project cost are shared between government and private sector in 40:60 ratio. The contract was awarded to the sponsor following a competitive bidding process (lowest bid criteria) launched by NHAI. Total project cost is estimated at $98.4 million of which $47.2 million will come from term loan, $ 11.8 million from sponsor's cash equity and the remaining $39.4 million from capital subsidy covering 40 percent of the total project cost. Then, Sadbhav will reimburse the 60 per cent arranged funding during the operational phase, since cash flow is assured in the form of annuity payments on semiannual basis along with interest. Financial close was reached on November, 2 2016. http://www.sadbhavinfra.co.in/en/pdf/financial-closure-announcement-snhpl-and-srhpl.pdf http://www.sadbhavinfra.co.in/en/pdf/financial-closure-announcement-snhpl-and-srhpl.pdf http://infracon.nic.in/WriteReadData/consultantprojects/569_File68924586.pdf |
Original sector | Transport |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
