logo

Ranchettes Central Drainage 2 & 3 Phase II

Sector: Power Transmission • Location: Cedar Park, Texas, United States of America

Source: Dodge USA

Project
Closed

The Ranchettes 2 & 3 Central Drainage Project Phase II generally includes preparation of right-of-way, mill and overlay of existing pavement, addition of ribbon lay-down curbs, construction of storm water infrastructure including inlets, storm conduit and channel grading, utility adjustment to valves, manholes, and services.

Status
Closed
Sector
Power Transmission, Water Supply and Storage, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial)
Location
Cedar Park, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ranchettes Central Drainage 2 & 3 Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ranchettes Central Drainage 2 & 3 Phase II” is an infrastructure initiative in the Power Transmission sector, located in Cedar Park, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ranchettes 2 & 3 Central Drainage Project Phase II generally includes preparation of right-of-way, mill and overlay of existing pavement, addition of ribbon lay-down curbs, construction of storm water infrastructure including inlets, storm conduit and channel grading, utility adjustment to valves, manholes, and services.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Cedar Park

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project