logo
ProjectPlanning Schematics

Rancho 30 Cultivation Facility Phase 4

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge USA

Phase 4 of the project would consist of 4 new buildings totaling 131,325 square feet of floor area within the parcel that is shared with Phase 3. The APN for Phase 4 is 3128-011-02. These 4 buildings are referred to as Building D, G, J, and M. Buildings D, G, and J would be a single level building and each building would consist of 34,425 square feet of floor area and would be used for cultivation

Status
Prospective
Sector
Raw Materials, Commercial
Location
Adelanto, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Rancho 30 Cultivation Facility Phase 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rancho 30 Cultivation Facility Phase 4” is an infrastructure initiative in the Raw Materials sector, located in Adelanto, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 4 of the project would consist of 4 new buildings totaling 131,325 square feet of floor area within the parcel that is shared with Phase 3. The APN for Phase 4 is 3128-011-02. These 4 buildings are referred to as Building D, G, J, and M. Buildings D, G, and J would be a single level building and each building would consist of 34,425 square feet of floor area and would be used for cultivation. Building M would be a single level processing building and would consist of 28,050 square feet ...

Budget

Location

Country

United States of America (USA)

State

California

City

Adelanto

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project