Rang du Brule - Asphalt Resurfacing & Extension Culverts
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Municipality of Saint-Antoine-sur-Richelieu is requesting bids for flexible asphalt resurfacing work on a section of Rang du Br l (4.7 km) between Mont e de la Pomme d'Or and the limits of Saint-Roch-de-Richelieu, i.e. 29,200 square meters, and the extension of two culvert ends and the installation of riprap.
- Status
- Closed
- Sector
- Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Government
- Location
- Abitibi, Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rang du Brule - Asphalt Resurfacing & Extension Culverts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Municipality of Saint-Antoine-sur-Richelieu is requesting bids for flexible asphalt resurfacing work on a section of Rang du Br l (4.7 km) between Mont e de la Pomme d'Or and the limits of Saint-Roch-de-Richelieu, i.e. 29,200 square meters, and the extension of two culvert ends and the installation of riprap. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Quebec |
City | Abitibi |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
