Range Road 80 Bridge Culvert Replacement REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The scope of work for this project includes, but is not limited to, the following: Traffic Accommodation for Bridge Construction Care of Water Fish Research License (FRL) and fish rescue Total Suspended Solids (TSS) Testing Removal of Damaged Bevel End Structural Excavation Channel Excavation SWSP Liner Concrete Grout Between Existing Culvert and SWSP Liner SWSP - Supply and Auger Heavy Rock Ripra
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Bridge, Cement, Hydro, Road, Waste Processing and Treatment, Government
- Location
- Kitscoty, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Range Road 80 Bridge Culvert Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this project includes, but is not limited to, the following: Traffic Accommodation for Bridge Construction Care of Water Fish Research License (FRL) and fish rescue Total Suspended Solids (TSS) Testing Removal of Damaged Bevel End Structural Excavation Channel Excavation SWSP Liner Concrete Grout Between Existing Culvert and SWSP Liner SWSP - Supply and Auger Heavy Rock Riprap Class 2 Heavy Rock Riprap Class 3 Backfill Granular Backfill - Non-Granular Beaver Dam Removal ... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Kitscoty |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Bridge, Cement, Hydro, Road, Waste Processing and Treatment, Government |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
