Ransom Hunter Park
Closed · North Carolina · Last reported Jul 2025
Source: Dodge
This project shall include the following: Removal of a portion of existing curb and gutter and installation of standard and accessible parking spaces and associated new curb and gutter. Installation of clay brick paver, concrete and asphalt pedestrian paving, custom playground and associated safety surfacing, shade pavilion, and interpretative signage. Installation of underground water line with m
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Car parking, Automotive, Commercial, Cement, Government
- Location
- Mount Holly, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ransom Hunter Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project shall include the following: Removal of a portion of existing curb and gutter and installation of standard and accessible parking spaces and associated new curb and gutter. Installation of clay brick paver, concrete and asphalt pedestrian paving, custom playground and associated safety surfacing, shade pavilion, and interpretative signage. Installation of underground water line with meter and backflow preventer, sewer line stub, and new stormwater facilities. Selective removal of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Mount Holly |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Car parking, Automotive, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
