RAPEL-HUASCO POWER
One of 3,492 projects Taiyo tracks in Chile.
Source: World Bank Group
The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Geothermal, Government
- Location
- Chile
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RAPEL-HUASCO POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70 MW generator, while space will be provided for a later addition of a fifth generating unit. Six single-phase transformers will be installed, as well as an outdoor switching station. Transmission lines include a 120 kilometer 220 KV double circuit line, a 90 kilometer 154 KV single circuit line, and 140 kilometers of 66 KV lines, including extension to substations, and additional transformers, and switching equipment. The Huasco thermal plant will include the installation of two boilers, and two 7.5. MW turbo generators. Two 8,500 KVA transformers will be installed in the outdoor substation to step up the voltage to 66 KV, and, transmission lines will be constructed to include double, and single circuit lines. Four sub-stations will be constructed to supply power, and upon operation, the Empresa Nacional de Electricidad S.A. (ENDESA) will construct additional 66 KV transmission lines to connect the plant with the interconnected system of Chile's central area. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Chile |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project