logo

RAPEL-HUASCO POWER

Sector: Water Supply and Storage • Location: Chile

Source: World Bank Group

Project
Closed

The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70

Project Information FAQ

Project Information

5 Q
The project “RAPEL-HUASCO POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Chile. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70 MW generator, while space will be provided for a later addition of a fifth generating unit. Six single-phase transformers will be installed, as well as an outdoor switching station. Transmission lines include a 120 kilometer 220 KV double circuit line, a 90 kilometer 154 KV single circuit line, and 140 kilometers of 66 KV lines, including extension to substations, and additional transformers, and switching equipment. The Huasco thermal plant will include the installation of two boilers, and two 7.5. MW turbo generators. Two 8,500 KVA transformers will be installed in the outdoor substation to step up the voltage to 66 KV, and, transmission lines will be constructed to include double, and single circuit lines. Four sub-stations will be constructed to supply power, and upon operation, the Empresa Nacional de Electricidad S.A. (ENDESA) will construct additional 66 KV transmission lines to connect the plant with the interconnected system of Chile's central area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data