logo
ProjectClosed

RAPEL-HUASCO POWER

One of 3,492 projects Taiyo tracks in Chile.

Source: World Bank Group

The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Geothermal, Government
Location
Chile
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about RAPEL-HUASCO POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RAPEL-HUASCO POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Chile. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rapel and Huasco Power Project, will finance a 280 MW hydropower plant, and a 15 MW thermal power plant, respectively as part of the Government's expansion program. The Rapel power plant will include construction of a dam across the Rapel river, creating a reservoir with a total discharge capacity of 10,000 cubic meters/sec. The powerhouse will be equipped with four turbines, each driving a 70 MW generator, while space will be provided for a later addition of a fifth generating unit. Six single-phase transformers will be installed, as well as an outdoor switching station. Transmission lines include a 120 kilometer 220 KV double circuit line, a 90 kilometer 154 KV single circuit line, and 140 kilometers of 66 KV lines, including extension to substations, and additional transformers, and switching equipment. The Huasco thermal plant will include the installation of two boilers, and two 7.5. MW turbo generators. Two 8,500 KVA transformers will be installed in the outdoor substation to step up the voltage to 66 KV, and, transmission lines will be constructed to include double, and single circuit lines. Four sub-stations will be constructed to supply power, and upon operation, the Empresa Nacional de Electricidad S.A. (ENDESA) will construct additional 66 KV transmission lines to connect the plant with the interconnected system of Chile's central area.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Chile

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project