logo
ProjectClose

Ras Al Khair Aluminum Smelter, Saudi Arabia

One of 10,000+ projects Taiyo tracks in Saudi Arabia.

Source: Bechtel

Ras Al Khair Aluminum Smelter,Delivery of the largest greenfield aluminum smelter in the world

Ras Al Khair, which is also Saudi Arabia’s first greenfield smelter, is the cornerstone of the Ras Al Khair Industrial City, which is located 56 miles (90 kilometers) north of Al Jubail, and fast becoming the country’s aluminum and phosphate center. Bechtel proudly partnered with our customers Ma’aden a

Status
Closed
Sector
Cement, Commercial, Fertilizers, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Telecommunications, Rail
Location
Saudi Arabia
Updated
22 Jul 2026
Source
Bechtel

ConstructChat

Ask ConstructChat about Ras Al Khair Aluminum Smelter, Saudi Arabia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ras Al Khair Aluminum Smelter, Saudi Arabia” is an infrastructure initiative in the Cement sector, located in Saudi Arabia. Taiyo aggregates data on it from Bechtel.

Participants

Company

Status

Original status

Close

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ras Al Khair Aluminum Smelter,Delivery of the largest greenfield aluminum smelter in the world Ras Al Khair, which is also Saudi Arabia’s first greenfield smelter, is the cornerstone of the Ras Al Khair Industrial City, which is located 56 miles (90 kilometers) north of Al Jubail, and fast becoming the country’s aluminum and phosphate center. Bechtel proudly partnered with our customers Ma’aden and Alcoa to provide engineering, procurement and construction management for the smelter, which was delivered safely, ahead of schedule, and under budget. The completed project included construction of two potlines that produce 740,000 metric tons of aluminum per year. Image gallery An award-winning project completed without sacrificing safety The emphasis placed on safety by the customers, contractor companies and Bechtel allowed the team to achieve over 25 million job hours without a lost work day injury. The project team included 46 different sub-contracting companies employing approximately 14,000 people from 25 different nationalities. They worked almost 60 million hours with a world-class safety record. The achievements of these dedicated workers included construction of raw-materials handling equipment and storage; a carbon plant for anode production and baking; electrical installations providing power for an entire “mine-to-metals” program; the world’s largest integrated cast house (with 15 furnaces); maintenance, administration, and support facilities; and a rail line to transport bauxite feedstock from a mine at Al Ba’itha. It took just 29 months from the moment Bechtel received the Notice to Proceed to achieve First Hot Metal at Ras Al Khair, which our customer said was in keeping with the most advanced and disciplined project construction practices anywhere in the world. Ras Al Khair, which achieved mechanical completion in 2013, won Engineering News-Record's Global Best Projects Award of Merit in the Power/Industrial category. What goes into building one of the world’s largest smelters 740 smelting furnaces, or pots, comprising four pot rooms of 180 pots each Each pot room is three-quarters of a mile (1.2 kilometers) long 8.4 million cubic yards (6.4 million cubic meters) of bulk earthworks 298,000 cubic yards (228,800 cubic meters) of concrete 48,000 metric tons of structural steel 157,000 pieces of mechanical equipment 171,000 pieces of electrical equipment 5,000 pieces of instrumentation  1,242 miles (2,000 kilometers) of electrical cables

Location

Country

Saudi Arabia

Source

Source reliability

Medium

Source

Bechtel

URL

More Details

Record type

Project

Sector

Cement, Commercial, Fertilizers, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Telecommunications, Rail

Article published date

2023-05-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project