logo

Ras Ghareb Wind Farm

Sector: Warehouse • Location: Egypt, Arab Rep.

Source: World Bank Group

Project
Active

The project scope consists of the development and operation of a 250-MW wind farm (Ras Ghareb Wind Farm) located in Rhas Gharib, Gulf of Suez, north of the Red Sea. The venture will be developed through a special purpose vehicle - Ras Ghareb Wind Energy. The SPV is owned by a consortium comprising Engie/SUEZ (40%), Toyota/Eurus Energy (40%) and Orascom (20%). Gulf of SUEZ is the first wind farm t

Status
Prospective
Sector
Warehouse, Wind, Raw Materials, Bridge, Power Generation (CCGT), Government, Automotive, Commercial
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ras Ghareb Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ras Ghareb Wind Farm” is an infrastructure initiative in the Warehouse sector, located in Egypt, Arab Rep.. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project scope consists of the development and operation of a 250-MW wind farm (Ras Ghareb Wind Farm) located in Rhas Gharib, Gulf of Suez, north of the Red Sea. The venture will be developed through a special purpose vehicle - Ras Ghareb Wind Energy. The SPV is owned by a consortium comprising Engie/SUEZ (40%), Toyota/Eurus Energy (40%) and Orascom (20%). Gulf of SUEZ is the first wind farm tendered on a BOO scheme and is part of the Egyptian government’s drive to increase the share of renewables in the energy mix with a target wind generation capacity of 7 GW by 2022. As Independent Power Producer, the plant's energy will be sold under a 20-year Power Purchase Agreement (PPA) to the Egyptian Electricity Transmission Company (EETC). The criteria for selecting a particular developer is the lowest cost per MWh. Egypt’s Ministry of Finance will guarantee offtake payments. The project will be executed on a build-own-operate (BOO) basis. The total investment cost amounts to approximately $400 million. The sponsors closed on $320 million in debt financing and $80 million in equity bridge loans (EBLs). Each sponsor has a two-year EBL for their full equity share: Société Générale is providing Engie’s EBL , Mizuho Toyota’s EBL and Attijariwafa Orascom's EBL. Japan’s NEXI is providing a guarantee covering the commercial lenders: SMBC and Société Générale which are lending $128 million, split equally. Japanese JBIC is providing a further $192 million in a separate tranche. The debt will have a tenor of 18-years door-to-door, allowing two years for construction. Construction will take 24 months. Financial closure occurred on December 14, 2017. https://energyegypt.net/2017/11/01/engie-orascom-toyota-win-contract-to-develop-250-mw-wind-farm-in-ras-gharib/ https://ijglobal.com/data/transaction/20132?name=Gulf%20of%20Suez%20IPP%20Wind%20Farm%20(250MW)&link=%2Farticles%2F131332%2Fengie-orascom-and-toyota-close-on-gulf-of-suez-wind

Original sector

Energy

Budget

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Warehouse, Wind, Raw Materials, Bridge, Power Generation (CCGT), Government, Automotive, Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project