Rasht–Astara Railway
Sector: Rail • Location: Rasht, Astara, Gilan Province, Iran
Source: WANA News Agency
The Rasht–Astara railway project is a 162-kilometer railway line that forms the missing link in the western branch of the International North–South Transport Corridor. It aims to complete Iran's rail connection to Azerbaijan and Russia, providing direct access to Europe without passing through Turkey. The project faces financial, environmental, and technical challenges, including increased elevate
- Status
- Under Construction
- Sector
- Rail, Road, Mass Transit, Government
- Location
- Rasht, Astara, Gilan Province, Iran
- Updated
- 22 Jul 2026
- Source
- WANA News Agency
ConstructChat
Ask ConstructChat about Rasht–Astara Railway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rasht–Astara railway project is a 162-kilometer railway line that forms the missing link in the western branch of the International North–South Transport Corridor. It aims to complete Iran's rail connection to Azerbaijan and Russia, providing direct access to Europe without passing through Turkey. The project faces financial, environmental, and technical challenges, including increased elevated track length and environmental concerns in the Gisum forest region. Initial route design and land acquisition are underway, with a $1.6 billion credit line from Russia addressing financing issues. The railway is expected to have a freight capacity of 7 million tons annually and could be operational within three to four years if obstacles are resolved. |
Original sector | Transport |
Budget |
Location
Country | Iran |
State | Gilan Province |
City | Rasht, Astara |
Source
Source | WANA News Agency |
URL |
More Details
Record type | Project |
Sector | Rail, Road, Mass Transit, Government |
Article published date | 2025-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
