logo
ProjectPlanning Schematics

RASIRC Imperial Facility

Sector: Metal • Location: Imperial, California, United States of America

Source: Dodge

N2H4 (Hydrazine) processing facility -The facility will include storage metal containers with appropriate cabinets and containers for raw chemical materials and waste, detached from the main building and constructed to store chemicals safely. The proposed building will be a total of 7,000 sq. ft. This building will be a warehouse facility with an office, parking, and site improvements. The buildin

Status
Prospective
Sector
Metal, Road, Chemical (Industrial), Warehouse, Manufacturing (Industrial), Car parking, Residential, Commercial, Automotive
Location
Imperial, California, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RASIRC Imperial Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RASIRC Imperial Facility” is an infrastructure initiative in the Metal sector, located in Imperial, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

N2H4 (Hydrazine) processing facility -The facility will include storage metal containers with appropriate cabinets and containers for raw chemical materials and waste, detached from the main building and constructed to store chemicals safely. The proposed building will be a total of 7,000 sq. ft. This building will be a warehouse facility with an office, parking, and site improvements. The building will have a driveway access from Old Highway 111

Budget

Location

Country

United States of America (USA)

State

California

City

Imperial

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Road, Chemical (Industrial), Warehouse, Manufacturing (Industrial), Car parking, Residential, Commercial, Automotive

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project