Rasp Mine Tailings Dewatering Plant
Sector: Solar • Location: Broken Hill, New South Wales, Australia
Source: GRAFA
Clean TeQ Water has been awarded a comprehensive design and construct contract for a new tailings dewatering plant at the Rasp Mine. The project involves transitioning from traditional solar drying to advanced, stackable tailings management using Clean TeQ's proprietary ATA technology. The facility is designed to handle 750,000 tonnes per annum of dry solids, supporting the mine's production capac
- Status
- Closed
- Sector
- Solar, Water Supply and Storage
- Location
- Broken Hill, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- GRAFA
ConstructChat
Ask ConstructChat about Rasp Mine Tailings Dewatering Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clean TeQ Water has been awarded a comprehensive design and construct contract for a new tailings dewatering plant at the Rasp Mine. The project involves transitioning from traditional solar drying to advanced, stackable tailings management using Clean TeQ's proprietary ATA technology. The facility is designed to handle 750,000 tonnes per annum of dry solids, supporting the mine's production capacity for silver, lead, and zinc. |
Original sector | Industrials |
Location
Country | Australia |
State | New South Wales |
City | Broken Hill |
Source
Source | GRAFA |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage |
Article published date | 2026-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
