Rasul Hydropower Plant
Sector: Hydro • Location: Pakistan
Source: World Bank Group
Rasul Hydropower Pvt. Ltd., subsidiary of the Habib Rafiq Group, was planning the development of the 20MW Hydropower Plant, run-of-river, at Rasul Barrage, Jehlum, Punjab. The project was expected to generate 89 GWh annually, at 50.8% capacity factor. The project was to be connected to the grid via a 2km transmission line, valued at $0.25 million (not included in project cost).
The project applie
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Rasul Hydropower Pvt. Ltd., subsidiary of the Habib Rafiq Group, was planning the development of the 20MW Hydropower Plant, run-of-river, at Rasul Barrage, Jehlum, Punjab. The project was expected to generate 89 GWh annually, at 50.8% capacity factor. The project was to be connected to the grid via a 2km transmission line, valued at $0.25 million (not included in project cost). The project applied for a tariff with NEPRA in March 2010. Construction was expected to take 39 months. The concession was for 30 years on a BOOT basis. The levelized tariff was estimated at $0.0817 per kWh. The feasibility report was completed in July 2009. A letter of intent was awarded by the Gujranwala Electric Power Company to purchase the electricity output in October 2009. Total cost was estimated at $38.31 million, to be financed at 80/20 debt to equity with a 10 year tenor and 3 year grace period. The project is reported as operational in November 2012. Financial closure date is ESTIMATED to be July 2011. http://en.wikipedia.org/wiki/List_of_power_stations_in_Pakistan http://www.nepra.org.pk/Tariff/IPPs/Rasul%20Hydro/2011/TRF-151%20RHPL%2003-01-2011%2028-30.pdf |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
