ProjectActive

Rasul Hydropower Plant

Active · Pakistan

Source: World Bank Group

Rasul Hydropower Pvt. Ltd., subsidiary of the Habib Rafiq Group, was planning the development of the 20MW Hydropower Plant, run-of-river, at Rasul Barrage, Jehlum, Punjab. The project was expected to generate 89 GWh annually, at 50.8% capacity factor. The project was to be connected to the grid via a 2km transmission line, valued at $0.25 million (not included in project cost).

The project applie

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Commercial, Government
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Rasul Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rasul Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rasul Hydropower Pvt. Ltd., subsidiary of the Habib Rafiq Group, was planning the development of the 20MW Hydropower Plant, run-of-river, at Rasul Barrage, Jehlum, Punjab. The project was expected to generate 89 GWh annually, at 50.8% capacity factor. The project was to be connected to the grid via a 2km transmission line, valued at $0.25 million (not included in project cost). The project applied for a tariff with NEPRA in March 2010. Construction was expected to take 39 months. The concession was for 30 years on a BOOT basis. The levelized tariff was estimated at $0.0817 per kWh. The feasibility report was completed in July 2009. A letter of intent was awarded by the Gujranwala Electric Power Company to purchase the electricity output in October 2009. Total cost was estimated at $38.31 million, to be financed at 80/20 debt to equity with a 10 year tenor and 3 year grace period. The project is reported as operational in November 2012. Financial closure date is ESTIMATED to be July 2011. http://en.wikipedia.org/wiki/List_of_power_stations_in_Pakistan http://www.nepra.org.pk/Tariff/IPPs/Rasul%20Hydro/2011/TRF-151%20RHPL%2003-01-2011%2028-30.pdf

Original sector

Energy

Procurement method

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Commercial, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project