Rasuwagadhi Hydropower Project
Sector: Hydro • Location: Nepal
Source: myRepublica
The Rasuwagadhi Hydropower Project in Rasuwa, Nepal, sustained major damage to its dam and headworks due to a glacial lake outburst flood (GLOF) from the Lhende River in Tibet on July 8. The project, built under the leadership of Chilime Hydropower Company, a subsidiary of the Nepal Electricity Authority (NEA), has resumed partial operation after undergoing repairs.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- myRepublica
ConstructChat
Ask ConstructChat about Rasuwagadhi Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | partial operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rasuwagadhi Hydropower Project in Rasuwa, Nepal, sustained major damage to its dam and headworks due to a glacial lake outburst flood (GLOF) from the Lhende River in Tibet on July 8. The project, built under the leadership of Chilime Hydropower Company, a subsidiary of the Nepal Electricity Authority (NEA), has resumed partial operation after undergoing repairs. |
Original sector | Energy |
Location
Country | Nepal |
Source
Source | myRepublica |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
