Ratija Power Plant Phase II
Sector: Commercial • Location: India
Source: World Bank Group
The project entails the construction of an additional 50MW capacity to the existing 50MW coal reject based thermal power plant at Village Ratija, District Korba, Chattisgarh by Spectrum Coal & Power Ltd ("project company") . The plant is set up in two phases of 50MW each. Phase I of the plant was commissioned on 27 February 2013 (other details not available) and Phase II is scheduled to start oper
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ratija Power Plant Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of an additional 50MW capacity to the existing 50MW coal reject based thermal power plant at Village Ratija, District Korba, Chattisgarh by Spectrum Coal & Power Ltd ("project company") . The plant is set up in two phases of 50MW each. Phase I of the plant was commissioned on 27 February 2013 (other details not available) and Phase II is scheduled to start operations by March 2017. The project sponsor is ACB (India) Ltd.Information on contract award method is not available. A 20 year PPA has been signed with Chhattisgarh State Power Trading Company (SPTC) and RETL for 35% of the capacity and the remaining will be sold through competitive bidding and on a merchant basis. The total project cost is USD $74.7million (INR 2.5billion)and will be financed in a Debt:Equity Ratio of 67/33. Financing comprises USD $40.3 million (INR 2.5billion) 11-year term loan provided by Axis Bank and USD $34.4 million (INR 2.1billion) equity. Financial close occurred on 5 March 2015. i) https://ijglobal.com/data/transaction/33710/ratija-coal-power-plant-phase-ii-50mw ii) Dealogic iii) http://thermalpower.industry-focus.net/independent-power-producers/611-acb-india-ltd-acb-india-ltd.html iv) http://www.acbindia.com/products_powerunderconstruction_50mw.aspx |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
