Rattman Road Reconstruction
Pre-design · Wisconsin · Last reported Mar 2024
Source: Dodge USA
Reconstruct Rattman Road from West Main Street south to Hoepker Road. The new roadway would be upgraded to an urban cross section with curb and gutter, storm sewer, and sidewalks or a bike path. Turn lanes would be studied at street intersections. This project includes design costs in 2026, which would likely be a contracted design project.
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Sun Prairie, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rattman Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconstruct Rattman Road from West Main Street south to Hoepker Road. The new roadway would be upgraded to an urban cross section with curb and gutter, storm sewer, and sidewalks or a bike path. Turn lanes would be studied at street intersections. This project includes design costs in 2026, which would likely be a contracted design project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Sun Prairie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
