logo

Ravensong Aquatic Centre Expansion Project

Sector: Commercial • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

Ravensong Aquatic Centre Expansion Project New Build The Ravensong Aquatic Centre Expansion project will double the size of the current, over-subscribed, 1995-built facility, connecting rural and urban residents of the Oceanside, BC area with publicly accessible, affordable aquatics programming that meets the needs of our diverse community. In meeting the highest published accessibility standards,

Status
Prospective
Sector
Commercial, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Ravensong Aquatic Centre Expansion Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ravensong Aquatic Centre Expansion Project” is an infrastructure initiative in the Commercial sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ravensong Aquatic Centre Expansion Project New Build The Ravensong Aquatic Centre Expansion project will double the size of the current, over-subscribed, 1995-built facility, connecting rural and urban residents of the Oceanside, BC area with publicly accessible, affordable aquatics programming that meets the needs of our diverse community. In meeting the highest published accessibility standards, the new facility will improve the RDN’s ability to serve community members facing additional barriers to participation, including seniors and residents with disabilities. Meeting the Canada Green Building Council’s Zero Carbon Standard V4, the highly efficient, all-electric building design will improve community services while cutting annual emissions by 94% and using 25% less energy than if designed to the 2020 National Energy Code for Buildings. The new facility includes a new pool area, design that addresses current facility overheating, and modernized change rooms that both alleviate current congestion and better accommodate diverse users.

Original sector

Other

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project