logo
ProjectBid Results, Planning Schematics

Raw Sewage Discharge Pipe Support Modifications

Bid results, planning schematics · Illinois · Last reported Sep 2025

Source: Dodge

  1. Remove existing Engineering Field Office ( Construction Trailer ) and cap existing utility connections. 2. Demolish existing pipe supports and install new pipe supports for 36-inch diameter discharge pipes from Raw Sewage Pumps #1, #2 and #3 in the North Pump Well of the Influent Pumping Station. Where compression-type joining devices are currently used at two locations per discharge pipe, inst
Status
Under Construction
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Residential, Power Transmission, Power Generation (CCGT), Government
Location
Des Plaines, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Raw Sewage Discharge Pipe Support Modifications

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Raw Sewage Discharge Pipe Support Modifications” is an infrastructure initiative in the Water Supply and Storage sector, located in Des Plaines, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results, planning schematics

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1. Remove existing Engineering Field Office ( Construction Trailer ) and cap existing utility connections. 2. Demolish existing pipe supports and install new pipe supports for 36-inch diameter discharge pipes from Raw Sewage Pumps #1, #2 and #3 in the North Pump Well of the Influent Pumping Station. Where compression-type joining devices are currently used at two locations per discharge pipe, install welded pipe sleeves to permanently join separate sections of discharge piping. 3. Demolish an...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Des Plaines

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Residential, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project