logo
ProjectClosed

Raw Water Intake Structure Access Bridge Pile Replacement

One of 10,000+ projects Taiyo tracks in Louisiana.

Source: Dodge

The project involves the replacement of nine existing timber piles with nine new steel piles. The timber piles will be cut two feet below ground level, and new steel piles will be installed to cap the remaining timber piles. Approximately 810 cubic yards (cy) of material will be excavated to remove the existing piles and prepare the site for the new steel piles. The excavated spoil will be tempora

Status
Closed
Sector
Water Supply and Storage, Road, Bridge, Forest Products and Packaging, Steel, Government, Commercial, Metal
Location
Luling, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Raw Water Intake Structure Access Bridge Pile Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Raw Water Intake Structure Access Bridge Pile Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Luling, Louisiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of nine existing timber piles with nine new steel piles. The timber piles will be cut two feet below ground level, and new steel piles will be installed to cap the remaining timber piles. Approximately 810 cubic yards (cy) of material will be excavated to remove the existing piles and prepare the site for the new steel piles. The excavated spoil will be temporarily sidecast, reused as backfill, and compacted immediately upon project completion.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Luling

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Bridge, Forest Products and Packaging, Steel, Government, Commercial, Metal

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project