Raw Water Transmission Main Upgrades Phase 2
Sector: Steel • Location: Cold Brook, New York, United States of America
Source: Dodge USA
. The Project generally consists of the following: Installation of approximately 5,200 linear feet of 54-inch welded steel or 63-inch HDPE piping within the Owner s easement and alongside the Owner s existing 24 and 36-inch transmission mains. Piping installation adjacent to Hinckley Reservoir Dam and West Canada Creek. Piping installation within the NYSDOT Route 365 right-of-way for a portion of
- Status
- Closed
- Sector
- Steel, Water Supply and Storage, Road, Hydro, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Cold Brook, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Raw Water Transmission Main Upgrades Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . The Project generally consists of the following: Installation of approximately 5,200 linear feet of 54-inch welded steel or 63-inch HDPE piping within the Owner s easement and alongside the Owner s existing 24 and 36-inch transmission mains. Piping installation adjacent to Hinckley Reservoir Dam and West Canada Creek. Piping installation within the NYSDOT Route 365 right-of-way for a portion of the work. One (1) interconnection with the Owner s existing 42-inch transmission main. Three (3) ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Cold Brook |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage, Road, Hydro, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
