Ray County 911 New Dispatch Facility Construction
Sector: Road • Location: Richmond, Missouri, United States of America
Source: Dodge
Summary Project Description: A new dispatch facility consisting of a one-story ICC-500 hardened precast construction facility approximately 12,000 GSF . The proposed Ray County 911 Dispatch Center is located southeast of the intersection of East Main Street and Matt Waler Drive in Richmond, Missouri. The project location and general site layout is shown in Figure 1. The new building will be a 12,0
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Summary Project Description: A new dispatch facility consisting of a one-story ICC-500 hardened precast construction facility approximately 12,000 GSF . The proposed Ray County 911 Dispatch Center is located southeast of the intersection of East Main Street and Matt Waler Drive in Richmond, Missouri. The project location and general site layout is shown in Figure 1. The new building will be a 12,000 square foot single-story, slab-on-grade structure. Maximum structural loads will be on the ord... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
