logo
ProjectNotice To Proceed

Rayalaseema lift scheme implementation Project,

Sector: Water Supply and Storage • Location: nandyal, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Information Water Resources Department, Govt. of A.P has come up with Rayalaseema lift scheme implementation Project, with a ticket size of 6829.15 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Administrative sanction acoorded for Rs 6829.15 compr

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT), Tunnel, Manufacturing (Industrial)
Location
nandyal, Andhra Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Rayalaseema lift scheme implementation Project,

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rayalaseema lift scheme implementation Project,” is an infrastructure initiative in the Water Supply and Storage sector, located in nandyal, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

notice to proceed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Water Resources Department, Govt. of A.P has come up with Rayalaseema lift scheme implementation Project, with a ticket size of 6829.15 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Administrative sanction acoorded for Rs 6829.15 comprises the following works. 1.Rayalaseema Lift Scheme to draw and utilize 3TMC per day from Sangameswaram to SRMC at Km 4 from Pothireddypadu Head Regulator Rs 3825 Crores. 2.Upgradation of canal system from Pothireddypadu Head Regulator and BCR.Complex from Foreshore of Srisailam Reservoir for Rs-570.45. 3. Lining of Existing SRBC / GNSS Canal upto Berm Level to draw 30,000 c/s up to Gorakallu Balancing Reservoir for Rs-939.65 Crores Construction of additional In fall regulator.with 3 vents to accommodate 10,000 c/s capacity including approach channel and leading channelfor GBR for Rs-36.95 Crores. Lining of Existing SRBC / GNSS Canal upto Berm Level to draw 30,000 c/s in between Gorukallu Reservoir to Owk Reservoir for Rs-1457.10 Crores.

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Andhra Pradesh

City

nandyal

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT), Tunnel, Manufacturing (Industrial)

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project