Rayalaseema lift scheme implementation Project,
Sector: Water Supply and Storage • Location: nandyal, Andhra Pradesh, India
Source: India Investment Grid (IIG)
Information Water Resources Department, Govt. of A.P has come up with Rayalaseema lift scheme implementation Project, with a ticket size of 6829.15 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Administrative sanction acoorded for Rs 6829.15 compr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Water Resources Department, Govt. of A.P has come up with Rayalaseema lift scheme implementation Project, with a ticket size of 6829.15 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Administrative sanction acoorded for Rs 6829.15 comprises the following works. 1.Rayalaseema Lift Scheme to draw and utilize 3TMC per day from Sangameswaram to SRMC at Km 4 from Pothireddypadu Head Regulator Rs 3825 Crores. 2.Upgradation of canal system from Pothireddypadu Head Regulator and BCR.Complex from Foreshore of Srisailam Reservoir for Rs-570.45. 3. Lining of Existing SRBC / GNSS Canal upto Berm Level to draw 30,000 c/s up to Gorakallu Balancing Reservoir for Rs-939.65 Crores Construction of additional In fall regulator.with 3 vents to accommodate 10,000 c/s capacity including approach channel and leading channelfor GBR for Rs-36.95 Crores. Lining of Existing SRBC / GNSS Canal upto Berm Level to draw 30,000 c/s in between Gorukallu Reservoir to Owk Reservoir for Rs-1457.10 Crores. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
