Raystown Lake Water Treatment Plant Upgrades REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project consists of but is not limited to the following: Reconfigure the piping of the WTP clearwell Install actuated valves or pump controls Modify the water sampling location and add flow measurement Modify the pressure distribution system discharge pump Drain, inspect, and clean the clearwell Replace filter media in both filters. Replace the filter control panel May include bid items to ins
- Status
- Closed
- Sector
- Water Supply and Storage, Broadband, Telecommunications, Waste Processing and Treatment, Commercial
- Location
- Hesston, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Raystown Lake Water Treatment Plant Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of but is not limited to the following: Reconfigure the piping of the WTP clearwell Install actuated valves or pump controls Modify the water sampling location and add flow measurement Modify the pressure distribution system discharge pump Drain, inspect, and clean the clearwell Replace filter media in both filters. Replace the filter control panel May include bid items to install fiber and make required connections along with a fiber-optic connection Replace PLC and inst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Hesston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Broadband, Telecommunications, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
