RCM Replace Siding on Admin Building
Sector: Commercial • Location: Walla Walla, Washington, United States of America
Source: Dodge USA
Provide exterior stucco on the newly established Admin Building at Whitman Mission National Historic Site. Existing exterior finish and flashing would be removed and disposed of at an approved waste disposal site. Where necessary, repairs would be completed to the exterior sheathing of the building, including placement of a vapor barrier.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Residential
- Location
- Walla Walla, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RCM Replace Siding on Admin Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Provide exterior stucco on the newly established Admin Building at Whitman Mission National Historic Site. Existing exterior finish and flashing would be removed and disposed of at an approved waste disposal site. Where necessary, repairs would be completed to the exterior sheathing of the building, including placement of a vapor barrier. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Walla Walla |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
