Re-Construction of Rigid portions of Secondary Runway, K and A Taxiway and Strengthening of C Taxiway at NSCBI Airport Kolkata.
Sector: Aerospace & Defense • Location: North 24 Parganas, West Bengal, India
Source: India Investment Grid (IIG)
Information Airports Authority of India has come up with Re-Construction of Rigid portions of Secondary Runway, K and A Taxiway and Strengthening of C Taxiway at NSCBI Airport Kolkata. with a ticket size of 328.3 INR Crores. This project in Airports & Aviation Infrastructure sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. E
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Airports Authority of India has come up with Re-Construction of Rigid portions of Secondary Runway, K and A Taxiway and Strengthening of C Taxiway at NSCBI Airport Kolkata. with a ticket size of 328.3 INR Crores. This project in Airports & Aviation Infrastructure sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Civil works :- Due to sub-grade failure, re-construction of portions of Sec. Rwy, K Taxi, A Taxi &C Taxi is being carried out. Scope of sub-surface drainage, culverts included in the scope. After re-construction all these pavements will be able to cater E-category aircrafts. Electrical Works:- All existing AGL fittings to be replaced by LED fittings |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
