Re-thinking Solar Energy Delivery: Non-wire Solar-powered Energy-carriers, Integrated with Utility-scale Generation, to Advance Solar Adoption to 30%
Sector: Energy Storage • Location: Bothell, Washington, United States of America
Source: Department of Energy (DOE)
Sustained advances in solar technologies have led to a levelized cost of energy of less than $0.03 per kilowatt-hour (kWh) for utility-scale solar, but the delivered cost remains as high as $0.20/kWh in some states due to the ever-increasing costs of operations of transmission and distribution (T&D) infrastructure. This project is developing a non-wire delivery system to circumvent a utility's T&D
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Sustained advances in solar technologies have led to a levelized cost of energy of less than $0.03 per kilowatt-hour (kWh) for utility-scale solar, but the delivered cost remains as high as $0.20/kWh in some states due to the ever-increasing costs of operations of transmission and distribution (T&D) infrastructure. This project is developing a non-wire delivery system to circumvent a utility's T&D in order to accelerate solar adoption and achieve a delivered cost less than $0.15/kWh before 2025. The system includes a utility-scale solar array that is directly connected to an integrated mobile energy storage system with on-board power electronics systems. Since there is no grid-connection, the inverters and the alternating current balance of plant equipment are not required. Such solar plants can be seamlessly built with environmental permits only, eliminating the years-long process to secure grid interconnection rights and thereby eliminating a very large portion of the soft costs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
