REACT - Decommissioning of Non-engineered Four Remaining Cells of the Transfer Station of Humboldt
Sector: Government • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The REACT - Decommissioning of Non-engineered Four Remaining Cells of the Transfer Station of Humboldt project (the Project) objective is to decommission and reclaim the historical hilltop cells of Humboldt landfill of REACT Waste Management. The cells to be decommissioned are within a landfill that has a surface area of 3.11 hectares and was permitted to only receive municipal waste during its op
- Status
- Prospective
- Sector
- Government, Waste Processing and Treatment
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about REACT - Decommissioning of Non-engineered Four Remaining Cells of the Transfer Station of Humboldt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The REACT - Decommissioning of Non-engineered Four Remaining Cells of the Transfer Station of Humboldt project (the Project) objective is to decommission and reclaim the historical hilltop cells of Humboldt landfill of REACT Waste Management. The cells to be decommissioned are within a landfill that has a surface area of 3.11 hectares and was permitted to only receive municipal waste during its operation. The landfill is currently in operation as a transfer station. The Environmental Site Assessment Level II and the Corrective Action Plan have been already completed; therefore, the scope of the project includes completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. The landfill is now c |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government, Waste Processing and Treatment |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Wood Buffalo Water Treatment Plant Expansion
- Coca-Cola Centre
- Children's and Women's Clinical Support Building
- Alberta Schools Alternative Procurement Phase 2
- New Central Library & Library Plaza - LRT Encapsulation
