logo

Ready Wyoming Transmission Line Project

Sector: Power Generation (CCGT) • Location: Cheyenne, Wyoming, United States

Source: Cowboy State Daily

Project
Under Construction

A $260 million, 260-mile transmission expansion project by Black Hills Energy to connect the electric grids serving northeast Wyoming and Rapid City down to Cheyenne, creating an interconnected system for the first time. The project includes six new replacement or expanded substations and is expected to be fully operational by the end of 2025.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Cheyenne, Wyoming, United States of America
Updated
22 Jul 2026
Source
Cowboy State Daily

ConstructChat

Ask ConstructChat about Ready Wyoming Transmission Line Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ready Wyoming Transmission Line Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Cheyenne, Wyoming, United States. Taiyo aggregates data on it from Cowboy State Daily.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $260 million, 260-mile transmission expansion project by Black Hills Energy to connect the electric grids serving northeast Wyoming and Rapid City down to Cheyenne, creating an interconnected system for the first time. The project includes six new replacement or expanded substations and is expected to be fully operational by the end of 2025.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wyoming

City

Cheyenne

Source

Source

Cowboy State Daily

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-06-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project