logo
ProjectClosed

Real Time Control Implementation Phase 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The scope of Work consists of but is not limited to the following: Manufacturing, delivery, installation, connection and/or in-situ construction of new structures, sewers and other features as noted on the contract drawings, including backfill, compaction and restoration of surfaces to existing conditions. Supply, installation, testing and commissioning of all other site works including removal, c

Status
Closed
Sector
Manufacturing (Industrial), Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
Location
Hamilton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Real Time Control Implementation Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Real Time Control Implementation Phase 2” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Hamilton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of Work consists of but is not limited to the following: Manufacturing, delivery, installation, connection and/or in-situ construction of new structures, sewers and other features as noted on the contract drawings, including backfill, compaction and restoration of surfaces to existing conditions. Supply, installation, testing and commissioning of all other site works including removal, clearing and grubbing, grading, excavation, backfill, roadway, landscaping, signage, concrete work...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Hamilton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project