logo

Realisation of line section 3

Sector: Mass Transit • Location: Germany

Source: EU Funding & Tenders Portal

Project
Ongoing

Upgraded line (Amsterdam –) D/NL border – Emmerich – Oberhausen The Emmerich-Oberhausen line is an important part of the European freight transport network. With a length of around 73 kilometres, it is an important piece of the puzzle in the freight corridor from Rotterdam to Genoa. The line has reached its limits due to the increase in freight and passenger transport in recent years. To reflect

Project Information FAQ

Project Information

4 Q
The project “Realisation of line section 3” is an infrastructure initiative in the Mass Transit sector, located in Germany. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Upgraded line (Amsterdam –) D/NL border – Emmerich – Oberhausen The Emmerich-Oberhausen line is an important part of the European freight transport network. With a length of around 73 kilometres, it is an important piece of the puzzle in the freight corridor from Rotterdam to Genoa. The line has reached its limits due to the increase in freight and passenger transport in recent years. To reflect this development, Deutsche Bahn will be carrying out major building works on the line over the next few years. Various engineering works will be implemented in several stages. The core of the project will be the triple-track upgrade of the line to increase line capacity and optimise operational processes. Previously, the control-command and signalling system (CCS) was modernised in a first step and the electronic interlocking in Emmerich was put into operation in 2013. Renewing the changeover of the railway electrification systems at the border to the Netherlands in 2015 simplified international rail transport and saves time. The line will also be equipped with the European Train Control System (ETCS). The work packages applied for are part of the upgraded line (Amsterdam) D/NL border – Emmerich –Oberhausen and are located in line section 3 between Voerde-Friedrichsfeld (planning approval section 2.1) and Wesel (planning approval section 2.2). The following work packages are mandatory for the development and realisation of the three-track line extension in line section 3. Work package 1 accompanies the measures defined with work package 2. It includes design work in the implementation phase, construction supervision services and project management services. Work package 2 includes the construction of the 3rd track and includes all construction preparation measures (phase 0) in the entire line section 3 as well as construction phases 1 and 2 in the planning approval sections 2.1 and 2.2 between the beginning of line section 3 and the beginning of Wesel station.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data