Rear End Aerodynamic and Aeroelastic Studies
Ended · United Kingdom
Source: EU Funding & Tenders Portal
TailSurf will contribute to the design, testing, integration and optimisation of ARE for the improvement of performance at component level of 20% weight reduction, 20% recurring cost reduction and 50% lead time reduction. It is also expected that 1.5% reduction of fuel burn at aircraft level will be achieved from the optimal rear end configurations. The specific objectives and the associated work
- Status
- Closed
- Sector
- Aerospace & Defense, Tunnel, Wind, Education, Government
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Rear End Aerodynamic and Aeroelastic Studies
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TailSurf will contribute to the design, testing, integration and optimisation of ARE for the improvement of performance at component level of 20% weight reduction, 20% recurring cost reduction and 50% lead time reduction. It is also expected that 1.5% reduction of fuel burn at aircraft level will be achieved from the optimal rear end configurations. The specific objectives and the associated work packages to achieve this aim are shown below. 1. To define and test technologies and shapes to delay the flow separation, leading to stall of the tail surface and saturation of the control surfaces (WP1 – deliverable DX in MX). Thee control effect of these technologies and devices will be verified by both wind tunnel experiments and computational fluid dynamics (CFD) on high-performance computing (HPC) facilities. 2. To study means and concepts to increase aeroelastic efficiency of tail surfaces using computational and experimental means. 3. To study the integration of all technologies on an advanced rear-end configuration and numerical prediction and post-test calibration. 4. To investigate the applicability of plasma actuators (DBDs) for de-icing and delaying stall experimentally. 5. To carry out management and administration required over the course of the whole project. It will serve to administer and manage the project in accordance with the Clean Sky 2 Management Manual, including the management of risks, finances and administrative tasks. It will also be essential to promote the project results and scientific and technical outcomes through targeted dissemination and communication activities |
Location
Country | United Kingdom (UK) |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Tunnel, Wind, Education, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
