Reay Road Cable-Stayed Bridge
Sector: Government • Location: Mumbai, Maharashtra, India
Source: Free Press Journal
The Reay Road cable-stayed bridge is a significant infrastructure project in Mumbai, set to be inaugurated on May 13, 2025. Unlike its predecessor, this new bridge lacks direct access to the Reay Road railway station, with pedestrian access only available via Sant Savta Mali Marg. The bridge is designed to accommodate six lanes of vehicular traffic but raises safety concerns due to the absence of
- Status
- Closed
- Sector
- Government, Mass Transit, Road, Rail, Bridge
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Free Press Journal
ConstructChat
Ask ConstructChat about Reay Road Cable-Stayed Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Reay Road cable-stayed bridge is a significant infrastructure project in Mumbai, set to be inaugurated on May 13, 2025. Unlike its predecessor, this new bridge lacks direct access to the Reay Road railway station, with pedestrian access only available via Sant Savta Mali Marg. The bridge is designed to accommodate six lanes of vehicular traffic but raises safety concerns due to the absence of footpaths. |
Budget |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Free Press Journal |
URL |
More Details
Record type | Project |
Sector | Government, Mass Transit, Road, Rail, Bridge |
Article published date | 2025-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
