REC Power Project - Substations and Transmission Lines in Uttar Pradesh
Sector: Power Generation (CCGT) • Location: Uttar Pradesh, India
Source: InvestyWise
Construction of two substations (220/132/33 kV AIS Substation at Ranipur (Mau) and 220/132/33kV AIS Substation at Chunar (Mirzapur)) and associated transmission lines in Uttar Pradesh under the Build, Own, Operate, and Transfer (BOOT) model for 35 years. The project involves transmission charges of Rs. 450.11 Million per year and an estimated construction period of 18 months.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- InvestyWise
ConstructChat
Ask ConstructChat about REC Power Project - Substations and Transmission Lines in Uttar Pradesh
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of two substations (220/132/33 kV AIS Substation at Ranipur (Mau) and 220/132/33kV AIS Substation at Chunar (Mirzapur)) and associated transmission lines in Uttar Pradesh under the Build, Own, Operate, and Transfer (BOOT) model for 35 years. The project involves transmission charges of Rs. 450.11 Million per year and an estimated construction period of 18 months. |
Original sector | Power Transmission |
Budget |
Location
Country | India |
State | Uttar Pradesh |
Source
Source | InvestyWise |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
